Construction also advanced cold !

פורסם ב: יא' טבת תשע"ז

.

Congratulations! The walls of the first floor are up and we are now getting ready to pour the concrete for he floor that will contain the Beit Midrash (Study Hall). Right now, the steel rods are being put in place, in the hope that the concrete will be poured next week.

.

.

   

תפריט תפריט